The working answer is one refill cycle plus about a day of slack, counted item by item rather than as one number for the whole pantry. If your supplier refills on a fixed day every week, the par level for each item is simply what your office gets through in those seven days, plus a little margin for the week that runs hot. For most Bangalore offices that is a far smaller cupboard than the one they currently keep, because a shortfall no longer costs a week: on a weekly schedule you choose the delivery day, and an emergency top-up can go out the same day if you flag it before noon. Once same-day refills exist, the cupboard stops being the safety net, and over-stocking turns into cash sitting on a shelf going stale.
A par level is the quantity you want sitting on the shelf at the moment the refill arrives — not the quantity you order. The order is the gap between the par level and whatever is left. Think of it as the line on the wall: the standing weekly order tops every item back up to its line, and the only thing anyone has to decide each week is whether a line is in the right place.
This matters because the alternative is what most admin teams actually do: someone eyeballs the shelves on the way to a meeting and guesses. That produces both failure modes in the same month — the office runs out of coffee on a Thursday, and three unopened cartons of a juice nobody drinks sit behind the microwave until they expire. Par levels replace the guess with arithmetic you do once and revisit quarterly.
Do not go looking for an industry benchmark. Per-head pantry consumption varies so widely between a 40-person product team on Outer Ring Road and a 200-person support floor in Electronic City that any published average will be wrong for you in both directions. Measure instead — it takes two weeks and no tools.
The item that ran out mid-count is the one to pay attention to. It is telling you its old line was too low, and it is usually coffee, milk or the one biscuit everybody likes.
Treating every SKU the same is the most common mistake in a pantry list. Split the shelf into three groups and the buffer sorts itself out.
The city changes the arithmetic more than the pantry does, and almost all of it is about the last two kilometres rather than the distance.
These three break the weekly model, and trying to force them into it is what produces both stale fruit and an empty water station.
Water is a frequency question, not a par-level one. Twenty-litre cans run on their own daily or alternate-day schedule, with empties picked up on the same trip, so the only number that matters is how many full cans you want standing at the start of a day. Count the dispensers, not the people. Fresh milk and fruit work the same way: raise the delivery frequency and keep the line low, because the cost of a short delivery is one afternoon, while the cost of over-ordering is a bin.
One named person, and in practice it should be whoever already receives the delivery. Splitting the count from the receiving is how par levels quietly stop matching the office.
One page, one row per item, four columns: the item in the unit you buy it in, the par level, the current count, and the order quantity that closes the gap. Nothing else earns a column. If it fits on a page it gets used; if it becomes a spreadsheet with a tab per category, it gets abandoned inside two months and the pantry goes back to guesswork.
Once the sheet exists, the standing weekly order should match it without anyone retyping anything, and the only weekly decision left is whether any line has drifted. That is the point of the exercise: not a tightly optimised cupboard, but a pantry nobody has to think about on a Thursday afternoon.